Project, program and portfolio management maturity model (P3M3)
Project Maturity Models
•
3m 36s
As an original author of P3M3 Rod introduces us to each level of maturity and the purpose of the model, and how the 5 levels are separated into 7 areas including governance and control as the two core areas and 5 other topics.
Up Next in Project Maturity Models
-
P3M3 maturity levels
Rod tells us about P3M3 maturity levels and what these look like within an organisation, and how an organisation and move from one level to another. He talks about the fun places to work and those that are boring but consistent.
-
Behaviours in P3M3
Adding behaviours to P3M3 was not easy, Rod describes how this was done and what ultimately demonstrates at levels 1 to 4 on how individuals demonstrate their ability to achieve each level of maturity.
-
Identifying a level 5 P3M3 organisation
Here Rod describes the development of P3M3 and looking for a level 5 organisation. While few organisations attain this level of maturity some get close, Rod talks about one and how it demonstrated it was very close.